Educational Complex Project
Client: Bloom Campus Education LLC
Consultant: National Engineering Bureau
Main Contractor: Airolink Building Contracting LLC
Location: Al Barsha, Dubai, UAE
The Project is sited at a Built-up area of approximately 37083 Sqmtr. which comprises multiple build- ings with School and College. This has been powered by 4 nos. of 1500kVA transformer with a total connected load of 5.20 Mega Watts. Project includes Complete Electrical services Supply, installation, Testing and commissioning.